You'll see a water gauging station in the middle of the bridge. This was part of a flood control project built by the Army Corps of Engineers in response to the 1967 flood that devastated Fairbanks.
You'll see a water gauging station in the middle of the bridge. This was part of a flood control project built by the Army Corps of Engineers in response to the 1967 flood that devastated Fairbanks.